Bengaluru is building India's AI future, but the data centers powering it need huge amounts of water in a city already running dry. Meanwhile, 300 million liters of treated water go unused every day.

Surplus treated waterRequired by law. Reused on-site. Surplus left stranded.
$1 to $11
[Rs 120 to 960] / 12,000L load
Equivalent to $0.11 to $0.92 [Rs 10 to 80] / kL
Fresh tanker waterScarce. Delivered. Expensive.
Up to $27
[Rs 2,400] / 12,000L load
Equivalent to $2.30 [Rs 200] / kL

Indian law requires large apartment buildings to treat sewage on-site. After internal reuse, the surplus still has nowhere to go.

In the same city, roughly half of Bengaluru's 13,900 borewells have run dry and tanker prices have doubled. The water exists. The buyer exists. The market does not.

Bengaluru is the best place on Earth to solve this first.

0+
Documented decentralised STPs
0 MLD
Treated daily by decentralised STPs
0 MLD
Apartment STP surplus market

“Bengaluru is a global lighthouse case for decentralised water reuse.”

Christian Binz, Eawag

Construction is our first buyer. As Bengaluru becomes India's data center capital, the same treated water network can supply cooling systems using the same model and at a much larger scale.

The mandate already exists. The missing piece is a trusted market for treated water.

SupplySewage treatment plants (STPs) create surplus
No logistics layer
No trusted quality handoff
No market maker
DemandConstruction and data centers need non-potable water

Supply exists. Demand exists. Policy exists. Vaha builds the exchange layer between them.

Vaha turns surplus water from sewage treatment plants (STPs) into a verified local supply loop.

01
Match

Pair apartment sewage treatment plant (STP) surplus with a nearby construction buyer.

02
Verify

Water Acceptance Pack issued before every dispatch.

03
Deliver

Existing tankers move water into existing site workflows.

Think of Vaha like Airbnb for treated water. We do not own the water, the trucks, or the plants. We make the route trusted and repeatable.

Water Acceptance PackWMP-25-05-1902
Source
Prestige Lake Ridge STP
Bengaluru, KA
Destination
Construction Site, North Gate
Bengaluru, KA
Dispatch Details
Date
17 May 2026
Time
06:45 AM
Vehicle
KA 05 AB 1234
Tanker
TN-08
Water Quality (Test)
pH7.1(6.5–8.5)✓
BOD (mg/L)4.6(<6)✓
COD (mg/L)19.2(<25)✓
TSS (mg/L)12.2(<20)✓
Fecal col.<D(<100)✓
Approved by (QMS)
Rudaiba Tarannum
2 May 2026, 11:30 AM

The savings are big before the route math even starts.

~$50K saved
per construction project
~$500K saved
per data center each year on cooling water
~$4 margin
per 12,000L trip for Vaha
One 12,000L load
Site pays: ~$13.7 [Rs 1,200] / load
Apartment gets: ~$1.4 [Rs 120] / load
Logistics: ~$8.0 to $8.5 [Rs 700 to 740] / load
Vaha gross margin: ~$4.1 [Rs 360] / load
What scale looks like
Market captureLoads / dayAnnual gross margin
1%250~$350K
5%1,250~$1.8M
10%2,500~$3.5M
20%5,000~$7.1M

Annual gross margin before overhead. Based on a ~$4.1 [Rs 360] midpoint margin per load across the 300 MLD apartment surplus market.

First come the construction routes. Then the same network expands into data center cooling water, where the same routing model serves a much larger need.

We validated the barrier, the route, and the first corridor.

Operator validation
Vikas Brahmavar

“Buyer trust in water quality is the barrier that decides whether the route works.”

Buyer-side validation
Practicing civil engineer

“The big hurdle is trust. Site managers need assurances before they will consider alternatives.”

Market proof
Boson Whitewater

Vikas confirmed that buyer trust in water quality is the core barrier. That is exactly what the Water Acceptance Pack is built to solve.

Vaishnavi Orchids

Active supply-side meeting scheduled with Vaishnavi Orchids apartment complex on the pilot corridor.

WELL Labs spatial analysis

88% of potential users are within 2 km of an existing or planned DSTP. Demand is nearly 3x decentralised supply.

Vaha turns isolated reuse into a repeatable exchange layer.

Pilot corridor
Bellandur
Kadubeesanahalli
Outer Ring Road, Bengaluru
Active supply-side meeting scheduled with Vaishnavi Orchids on this pilot corridor.
First 90 days
1.1 apartment sewage treatment plant (STP) source
2.1 construction buyer
3.1 tanker partner
4.1 quality workflow
Success metric
0
paid deliveries
0
rejected loads

The first loop proves the route. The next loops scale it.

Bengaluru does not need to wait for more water. It needs a better way to move the water it already has.

Construction is the first buyer. Data centers are the expansion path. That is the network Vaha is building.