Vaha
Bengaluru is building India's AI future, but the data centers powering it need huge amounts of water in a city already running dry. Meanwhile, 300 million liters of treated water go unused every day.
Indian law requires large apartment buildings to treat sewage on-site. After internal reuse, the surplus still has nowhere to go.
In the same city, roughly half of Bengaluru's 13,900 borewells have run dry and tanker prices have doubled. The water exists. The buyer exists. The market does not.
Bengaluru is the best place on Earth to solve this first.
“Bengaluru is a global lighthouse case for decentralised water reuse.”
Christian Binz, EawagConstruction is our first buyer. As Bengaluru becomes India's data center capital, the same treated water network can supply cooling systems using the same model and at a much larger scale.
The mandate already exists. The missing piece is a trusted market for treated water.
Supply exists. Demand exists. Policy exists. Vaha builds the exchange layer between them.
Vaha turns surplus water from sewage treatment plants (STPs) into a verified local supply loop.
Pair apartment sewage treatment plant (STP) surplus with a nearby construction buyer.
Water Acceptance Pack issued before every dispatch.
Existing tankers move water into existing site workflows.
Think of Vaha like Airbnb for treated water. We do not own the water, the trucks, or the plants. We make the route trusted and repeatable.
| pH | 7.1 | (6.5–8.5) | ✓ |
| BOD (mg/L) | 4.6 | (<6) | ✓ |
| COD (mg/L) | 19.2 | (<25) | ✓ |
| TSS (mg/L) | 12.2 | (<20) | ✓ |
| Fecal col. | <D | (<100) | ✓ |
The savings are big before the route math even starts.
| Market capture | Loads / day | Annual gross margin |
|---|---|---|
| 1% | 250 | ~$350K |
| 5% | 1,250 | ~$1.8M |
| 10% | 2,500 | ~$3.5M |
| 20% | 5,000 | ~$7.1M |
Annual gross margin before overhead. Based on a ~$4.1 [Rs 360] midpoint margin per load across the 300 MLD apartment surplus market.
First come the construction routes. Then the same network expands into data center cooling water, where the same routing model serves a much larger need.
We validated the barrier, the route, and the first corridor.
“Buyer trust in water quality is the barrier that decides whether the route works.”
“The big hurdle is trust. Site managers need assurances before they will consider alternatives.”
Vikas confirmed that buyer trust in water quality is the core barrier. That is exactly what the Water Acceptance Pack is built to solve.
Active supply-side meeting scheduled with Vaishnavi Orchids apartment complex on the pilot corridor.
88% of potential users are within 2 km of an existing or planned DSTP. Demand is nearly 3x decentralised supply.
Vaha turns isolated reuse into a repeatable exchange layer.
The first loop proves the route. The next loops scale it.
Bengaluru does not need
to wait for more water.
It needs a better way to move
the water it already has.
Construction is the first buyer. Data centers are the expansion path. That is the network Vaha is building.